    Conveyor Controls Engineering

    The controls, panels and commissioning that make a conveyor line run — from the people who stand on the floor at cutover.

    A conveyor is a mechanical system that does nothing until the controls tell it to. Black Box Engineering engineers the control layer for conveyor and sortation systems: the PLC and drive logic, the control panels, the safety circuits, the installation package, and the commissioning that proves the line hits rate. We do not build conveyors. We make the ones you already chose work.

    Platforms we work on

    • Allen-Bradley
    • Siemens

    Platform experience held by our engineers. We are not a partner or reseller of either.

    Designed to

    • NEC
    • NFPA 70E
    • NOM-001-SEDE

    What we do on a conveyor system

    • PLC and drive logic — zone control, accumulation, merges, diverts and transfers; VFD configuration and tuning on Allen-Bradley and Siemens platforms.
    • Sortation controls — divert logic, scanner and photo-eye integration, reject and recirculation handling, throughput tuning.
    • Control panels — designed and built in Mexico, from motor control and VFD packages to the remote I/O enclosures along the line.
    • Networks — EtherNet/IP and PROFINET architecture along a long line, where a scan-rate problem looks exactly like a mechanical one until someone who has seen both looks at it.
    • Upstream interfaces — the handshake with the warehouse control system, where most throughput problems actually live.
    • Installation packages — wire lists, termination schedules, conduit and cable tray routing, and the as-built drawings at turnover.

    Conveyor safety and the standards we work to

    Safety is where a conveyor controls scope earns its keep. Emergency stops, pull cords, guard and door interlocks, and the zero-energy states maintenance depends on are designed as safety functions — not added as wiring afterwards.

    We work to ISO 12100 for risk assessment and ISO 13849-1 for the performance level of each safety function, with the electrical design to NEC and NFPA 70E in the United States and NOM-001-SEDE in Mexico. Panels are built to UL 508A requirements with UL-listed components. We are not a UL 508A listed shop, and where a project needs a listed assembly the route is a field evaluation per panel.

    How we handle installation in Mexico and the United States

    In Mexico, we install. Control and network wiring, terminations and device mounting are done by our own technicians or by subcontractors working under our supervision, to NOM-001-SEDE, and checked point to point by the engineers who wrote the logic.

    In the United States, field installation is performed by a licensed electrical contractor. Our scope there is everything around it: the engineering, the panels, the installation drawings and wire lists, on-site supervision and coordination with the contractor, and the checkout and commissioning once the line is wired.

    Either way, the package that reaches the installer is the same one the commissioning engineer will work from — and that is the point. A conveyor start-up that slips usually slips on a termination that does not match the drawing.

    Why live cutover commissioning is the real test

    A new line in an empty building is a commissioning exercise. A retrofit in a distribution center that ships every night is a different job: a fixed access window, the rest of the building in production, and a tie-in to conveyance somebody else owns.

    We plan around the operating window from the first schedule, phase the cutover so the building can run overnight on whatever state the work is left in, and prove each change before the next window opens. I/O checkout, functional testing and rate testing are documented against the design, not remembered.

    Two ways we engage

    We take the scope — controls design, code, panels and commissioning, owned and signed for.

    We staff yours — our engineers embedded in an integrator's or OEM's program, executing to the prime's design and standards while the prime holds the contract.

    We name which one is on the table before anyone signs.

    What we do not claim

    We are not a conveyor manufacturer. We do not design or build conveyors, sortation equipment or the mechanical systems they run on. The equipment belongs to its manufacturer or integrator, and it stays theirs.

    We are not a licensed electrical contractor in the United States, and we do not present ourselves as one.

    We name no clients or sites. Our engineers work under confidentiality agreements on other companies' programs. If you need references, ask and we will arrange what our agreements allow.

    Talk to us about a conveyor controls scope

    Mexico City based, working across North America. Tell us the equipment, the rate the line has to hit, and the window you have to cut it over — and we will tell you what it takes.

    Frequently asked

    What people ask us first

    Do you install conveyor electrical work in Mexico?
    Yes. In Mexico, control and network wiring, terminations and device mounting are done by our own technicians or by subcontractors under our supervision, to NOM-001-SEDE, and checked point to point by the engineers who wrote the logic.
    Do you install conveyor electrical work in the United States?
    No. In the United States, field installation is performed by a licensed electrical contractor, and we are not one. Our scope there is the engineering, the panels, the installation drawings, on-site supervision and coordination, and commissioning.
    Which safety standards do you design conveyor controls to?
    ISO 12100 for risk assessment and ISO 13849-1 for the performance level of each safety function — emergency stops, pull cords and guard interlocks — with electrical design to NEC and NFPA 70E in the US and NOM-001-SEDE in Mexico.